EWB-UMN in Guatemala: Documents
|

File Type |

Date |

Description |
|
 |
 |
8/30/06 |
Minutes for the joint EWB-UMN/EWB MN Professional meeting. |
|
 |
8/30/06 |
Expanded budget for the Guatemala project. |
|
 |
8/30/06 |
501 EWB-USA Project Application for the Guatemala project. |
|
 |
8/30/06 |
806 EWB-USA Project Assessment Presentation for the Guatemala project. |
|
 |
8/30/06 |
Long Way Home Chimiya assessment report. |
|
 |
9/13/06 |
Guatemala site plan, generated by Kris Langlie. |
|
 |
9/13/06 |
"Preliminary Volume Flow Calculations for Guatemala Project", generated by Josh Quinnell. |
|
 |
9/18/06 |
Water and wastewater treatment budget sheet I, generated by Andrew Sander. |
|
 |
9/18/06 |
Water and wastewater treatment Autocad layout (.dwg), generated by Andrew Sander. |
|
 |
9/18/06 |
Pump sizing spreadsheet, generated by Tony Witkowski. |
|
 |
9/18/06 |
Water and wastewater treatment budget sheet II, generated by Ruth Wolinsky. |
|
 |
9/18/06 |
Budget information from Andrew, Mark and Geoff. Included are lists for the tools and supplies, materials for the security lighting and outlets, and equipment for the sprinkler system. |
|
 |
9/28/06 |
Water testing information from the Guatemala assessment trip, generated by Scott Nelson |
|
 |
10/22/06 |
Preliminary site plan, generated by Kris Langlie et al. |
|
 |
10/23/06 |
Top view of holding tank (AutoCAD), generated by Andrew Sander et al. |
|
 |
10/23/06 |
Side view of holding tank (AutoCAD), generated by Andrew Sander et al. |
|
 |
10/23/06 |
End view of holding tank (AutoCAD), generated by Andrew Sander et al. |
|
 |
|